KPM Ltd will remanufacture to better than OEM specifications, utilizing state of the art engineering and specific component upgrades.
- KPM Ltd. currently maintains over 40,000 hp in vertical / turbine / submersible en suction configuration
- KPM Ltd. is a world leader in enhanced wear part design manufacture for extreme service.
Pumping Applications
- We supply complete skid-mounted packages
Recent Projects
Some of our recent projects include:
- City of Kamloops – River Street High-Lift
1 @ 600 hp vertical turbine installation c/w ASD speed control, 7500 gal/min
1 @ 350 hp vertical turbine installation c/w ASD speed control, 3800 gal/min
1 @ 800 hp vertical turbine installation c/w ASD speed control, 8000 gal/min
- City of Kamloops – Cinnamon Ridge Booster
2 @ 250 hp vertical turbineCity of Kamloops – river Street Intake w/ crane
1 @ 200 hp, 12000 gal/min
- Valemount
- Village of Chase
- Hyde Mountain
- Ministry of Agriculture – 2 @ 50 hp vertical turbine, 600 gl/min
- City of Oliver – skid-mounted 30 hp, c/w variable speed drive
- Craigmont Mines
- Taseko / Gibraltar Mines
|